• Home >
  • Project Gallery

Project Gallery

View our Landmark Projects

Oil & Gas Facility Development – EPC Projects
  • EPCC Contract for Services – CDU Revamp during MAFTA 2017, 2017-2018, ORPIC
  • EPC Contract for Amal 1C Plant & HRSG Project, 2015-2018, PDO
  • EPC of Amin On-Plot Water Injection Development, 2012-2014, PDO
  • EPC of Saih Rawl Permanent PDO Accommodation Complex, 2013-2014, PDO
  • EPC of Saih Nihaydha Middle Ghariff Development Project, 2012-2013, PDO
  • EPC of Yibal Second Stage Depletion Compressor Project, 2012-2014, PDO
  • EPC of Saih Rawl Oil Integrity Piping Replacement Project, 2012-2014, PDO
  • EPC of Fahud Control System Upgrade Project, 2008-2009, PDO
  • EPC of Mabrouk Field Development Project, 2007-2008, PDO
  • EPC Nahada-1 Booster Station, 2006-2008, PDO
Oil & Gas Facility Development - Construction Projects
  • Construction of Yibal Rejuvenation Project, 2017-2021, PDO
  • Khulud Gas Development Project -Construction, Installation , Commissioning Services -PDO, 2017-2018, Enerflex
  • Tayseer Early Development Project Construction, 2017-2018, Exterran/PDO
  • BP Civil Pack 7&8 General Civil Works Construction, 2017-2020, BP Oman
  • Barka IWP Project – Electrical Erection Works, 2017, Suez International
  • Amal Steam Surface Facilities Phase 1C - On-Plot Construction,2015-2017, PDO
  • Construction and Installation of Well Site Facilities Phase II - Khazzan Gas Project, 2017-2019, BP Oman
  • Erection, Installation and testing of Electrical works for Musandam Power Plant, 2017, Wartsila
  • Construction and Installation of Well site Facilities - Khazzan Gas Project, 2015-2018, BP Oman
  • Procurement & construction of Sur Gas Supply  Station, 2012-2013, PDO
  • Mauddud Steam Flood Pilot Project, 2012, ProGauge Technologiess / Tatweer Petroleum, Bahrain
  • Rubble Steam Pilot Project, 2011, ProGauge Technologiess / Tatweer Petroleum, Bahrain
  • Amal Steam  Surface Facilities, 2010-2014, PDO
  • Harweel Cluster Phase II, 2008-2009, PDO
  • Burhaan Phase-II Construction Project, 2004-2005, PDO
  • Saih Rawl - Phase IV Expansion, 2004-2005, PDO
Off - Plot Projects
  • EPC of Well Testing Facilities, 2012-2014, PDO
  • EPC of Lekhwair Water Injection Project, 2011-2012, PDO
  • Flowline Installation and Site Construction Services, 2011-2012, BP
  • SaihRawl Gathering Expansion Project , 2006 , PDO
  • EPC Lekhwair Flow line Construction, 1995-1996, PDO
  • EPC Flow line & Manifold Construction Contracts, 1992-1993, ELF
Gas Treatment and Compression
  • Construction & Installation Package at HaqwaZauliyah(PDO), 2016-2017, Exterran
  • Daleel Petroleum – 2nd Gas Processing Train, 2016-2017, Exterran
  • Khamilah Gas Compressor Project , 2015 , Enerflex/ Occidental
  • Construction for Abu Tabul Gas plant Project, 2012-2014, Enerflex/OOCEP
  • Upgradation of Zuliyah Production Station, 2011, Exterran / PDO
  • Khazzan Gas Compression Facility, 2009-2010, Enerflex / BP
  • EPC of Gas Supply to Downstream Industries, 2008 to 2009, OGC
  • Daleel Gas Processing Plant , 2007-2008, Exterran / Daleel Petroleum
  • Zauliyah Gas Gathering/ Production Plant, 2007-2008, Exterran / PDO
  • Lekhwair GCU & Compression PC Project, 2007-2008, PDO
Long Term Service Contracts
  • ORPIC EPCC on Call off Basis Contract, 2016-2021, ORPIC
  • Oil & Gas Integrated Construction & Maintenance Services, 2017-2020, Tatweer Petroleum, Bahrain
  • Operations and Maintenance Site Support Services Contract, 2016-2018, BP Oman
  • Long Term Tank Maintenance Sohar, Muscat Plants &Raysut Depot for 3 Years, 2016-2019, ORPIC
  • Engineering, Procurement & Construction Contract – Nimr, 2015-2019, PDO
  • Pot Re-lining Mechanical works, 2016 - 2018 , Ma'adenAluminium
  • Pot Re-lining Services Contract, 2014 - 2019, Qatalum
  • Civil Works Services for Safah (Block 09) and Wadi Lathem (Block 27) Fields, 2013-2018, Occidental
  • Provision of General Construction Services-II, Awali Oil Field, 2012-2016, Tatweer Petroleum, Bahrain
  • Engineering & Maintenance Contract – North Oman, 2011-2021, PDO
  • Provision of General Construction Services-I, Awali Oil Field, 2011-2014, Tatweer Petroleum, Bahrain
  • Mukhaizna Maintenance Service Contract, 2007-2010, Occidental
  • KSF Integrated Service Contract, 2007-2010, Medco
  • Engineering & Maintenance Contract – North Oman, 2005-2010, PDO
  • Wellhead & Field Monitoring Equipment Maintenance & Support , 2001-2011, PDO
  • Engineering Service Contract DCME&I, 2001-2005, PDO
  • North Oman Campaign Maintenance, 1996-2001, PDO
  • Pipeline Maintenance Contract for North & South Oman, 1996-2000, PDO
Tanks
  • EPC of Tayseer Field Erected Tanks, 2017-2018, Exterran
  • Fabrication of 6 chamber GFT at Nimr (PDO), 2017-2018, Exterran
  • Construction of  Feed Water Storage Tanks (3 Nos) at Amal (PDO), 2016-2017, Glass Point Solar Muscat LLC
  • Construction of Tanks (6 Nos) for Amal Steam Surface facilities Project, 2016-2017, PDO
  • Sadad Dehydration Tank Project, 2016-2017, PDO
  • EPC of 8 Tanks for WTP-LOT 4 at  Mukhaizana, 2013-2014, Occidental
  • EPC of 10 Tanks at Safah and Wadi Latham, 2012- 2014, Occidental
  • EPC of 3 Condensate & Diesel storage Tanks at Abu Tabul Block-60 Gas Processing Plant, 2012-2013, Enerflex / OOCEP
  • EPC of Tanks at  Amin On-Plot Water Injection Development, 2012-2014, PDO
  • EPC of 4 Chamber Gas Floatation Tank at Suwaihat, 2012-2013, PDO
  • EPC of 7 Tanks for GAP SAC Project, 2010, Occidental
  • EPC of 5 Tanks at Shah & Sahil Field Abu Dhabi, 2010- 2012, TR  / ADCO
  • EPC of 5 Tanks at Marmul Polymer Flooding Project, 2007-2008,BEC/PDO
  • EPC of 3 Tanks at Safah and Wadi Latham, 2007- 2008, Occidental
Turnaround & Shutdown
  • Aromatics Package-1 2017 Turnaround, 2017, EQUATE Petrochemical Company
  • EG1 and ASP Turnaround -2016 Equate Kuwait ,2016, EQUATE Petrochemical Company
  • Sohar Refinery Long Term TA Routine Main Mechanical (Static) Contract, 2015-2018, ORPIC
  • ORPIC  2015 Sohar refinery Emergency shutdown, 2015 , ORPIC
  • OMC Turnaround 2015 - Non Reformer Jobs, 2015, Oman Methanol Company LLC
  • Main Mech. Contract Static –Mina-Al Fahal Refinery, 2014, ORPIC
  • Turnaround of  Salalah Methanol Plant, 2014, SMC
  • Turnaround of Aromatics  Plant – Sohar Refinery 2013 , ORPIC
  • Turnaround of Polypropylene Plant – Sohar 2013, ORPIC
  • Major Refinery Turnaround – Mina-Al Fahal Refinery, 2012 , ORPIC
  • Minor Refinery Shutdown – Mina-Al Fahal Refinery, 2010 , ORPIC
  • Major Refinery Turnaround – Sohar, 2010 , ORPIC
  • Minor Refinery Shutdown – Mina-Al Fahal Refinery, 2008 , ORPIC
  • Major Refinery Turnaround – Mina-Al Fahal Refinery, 2007, ORPIC
Workshop – Fabrication
  • Fabrication & supply of LTCS Vessels  for LPIC Project, 2017-2018, GS E&C / ORPIC
  • Fabrication & supply of SS, CS & Heat Exchangers for LPIC Project, 2016-2017, Tecnimont / ORPIC
  • Fabrication & supply of Cladded Scrubbers for SNDC/KDC 2 Project, 2016-2017, L&T Hydrocarbon/PDO
  • Fabrication & supply of Clad  Vessels & Columns for Yibal Khuff Project (YKP), 2016-2017, Petrofac/PDO
  • Fabrication & Testing of Gas Dehydration Packages to Rabab Harweel Integrated Project(RHIP), 2016 – 2017, Prosernate/PDO
  • Fabrication & supply of Shell & Tube Heat Exchangers for Takatuf Project ( TPO), 2016-2017, Petrofac /OOC
  • Fabrication & supply of Heavy Thick Separators for Mabrouk Deep Ph 3 Project, 2015-2017, WPOE /PDO
  • Fabrication & supply of HP CS vessels with U2 stamp for Rabab Harweel Integrated Project(RHIP), 2015-2016, Petrofac/PDO
  • Fabrication & Supply of CS/SS , Pressure Vessels for BP Khazzan CPF, 2015-2016, Petrofac / BP
  • Fabrication & supply of Process & Utility Skids for BP Khazzan CPF, 2015-2018, Petrofac/BP
  • Supply of Cyclic Steam Service Manifolds (13 nos) for Amal 1C project, 2015-2016, Worley Parsons/PDO
  • Fabrication of Power Modules for HRSG (12 Nos) for Amal-1C Steam Project, 2014-2015, Nooter/Eriksen/ PDO
  • Columns & Vessels for Sohar Refinery Improvement Project, 2014-2015 Daelim-Petrofac/ ORPIC
  • Fabrication of 59 MSV Skids for South ODC, 2014-2015 Al Turki/ PDO
  • Fabrication of Power Modules for HRSG (10 Nos) for Amal-1B Steam Project, 2012, Nooter/Eriksen/ PDO
  • Fabrication of  SS & CRA piping for Turkmenistan Gas Project, 2011-2012, Petrofac
  • Fabrication of OTSG Steam Generators (7 Nos) for Amal Steam Project, 2010 - 2011, Progauge Technologies 
Workshop Maintenance
  • High & Low energy Centrifugal Pump Maintenance Services ,2016-2017, Hydro middle East Inc / PDO.
  • Ball valves repair & testing service contract ,2014 -2019, Occidental of Oman Inc.
  • Call off contract for isolation valves service & testing- 2016 -2019, ORPIC
  • Call off contract for multistage centrifugal pumps overhauling- 2015-2018, ORPIC
  • Service contract for pumps, valves, compressor, blower, mechanical parts repair - 2009-2019, Occidental Mukhaizna
  • Repair & testing of various valves, pumps, RVs and other equipment, Exterran Middle East
  • Repair & maintenance of pumps, valves, PSV/PRV/PVVs - 2012- 2016, Shell Oman marketing MAF
  • High and low energy centrifugal Pump Maintenance Services Contract, 2010-2016, PDO
  • Relief Valves Calibration & Maintenance for Oman Methanol Sohar during Shutdown, 2015, OMC
  • Relief Valves Calibration & Maintenance for MAF Refinery during Shutdown, 2014, ORPIC
Aluminium Smelter Fabrication & Maintenance Services
  • Booster  Busbar Project : Installation of Busbars for Booster , Sohar Aluminium 2017
  • Pot Re-lining Mechanical works, 2016 - 2018 ,Ma'adenAluminium
  • Aluminium Busbar Installation, 2016 , CPCA JV (Advanced Metal Industries Cluster Company Ltd( AMIC) and Toho Titanium Co Ltd (TOHO)
  • Pot Shell maintenance contract , 2014 - 2020 , Qatalum(Qatar Aluminium)
  • Live Tie-in welding of R-50(Negative & Positive) at Aluminium Bahrain(ALBA), 2014, Fuji/Airmech
  • Kitimat Smelter Modernization Project- Anode Beam machining , 2012-2014, United Industrial Services Company LLC (UNISCO)
  • Installation and Welding of Rectifiers Bus bar System for EMAL Phase -II , 2012-2013, Fuji/ Danway
  • Installation and Live Welding of Rectifiers Bus bar System for EMAL Phase – I Upgrade , 2011-2012, Fuji/ Danway
  • Installation and Welding of Rectifiers Bus bar System for EMAL Phase-I, 2009-2010, Fuji/ Danway
  • Emirates Aluminium Bus bar Project ( EMAL) , 2009-2010, SNC -Lavlin Worley Parson (SLWP)
  • Short Circuit Bridge for Sohar Aluminum , 2008, Sohar Aluminium
  • Anode Stem Maintenance Contract by Sohar Aluminum, 2008- 2013, Sohar Aluminium
  • Sohar Aluminium Busbar Project, 2006 – 2008, Bechte
HDPE Tite Lining, Rotolining, Free standing, Pond lining - Engineering, Procurement, Construction & Maintenance Projects
  • Tite Liner® 6" x 200 km for GC30 Project, Kuwait Oil Company. 2017
  • Tite Liner® 16” x 2.5 km Manifa, Saudi Aramco. 2017
  • Tite Liner 24” x 6.5 km Safaniya, Saudi Aramco. 2017
  • Tite Liner® 8"x 16.5 km, In Salah Gas, Algeria.  2016
  • Tite Liner® 6" to 36” x 430 km for Wara Pressure Maintenance Project, Kuwait Oil Company. 2014-2015
  • Tite Liner® 4” to 24” x 200 km for various flowlines, headers at Daleel Petroleum. 2014-2015
  • Tite Liner® 3” and 8” RAS Tanura Integrated Project, Saudi Arabia. 2014
  • Tite Liner® 24”x 2.5km (one section) for offshore produced water disposal pipeline, Oxy Qatar. 2013
  • Tite Liner® 4” – 18”x 157 km for Effluent Water Injection Phase–I and Sea Water Injection Phase –II, Kuwait Oil Company.  2012-2014
  • Tite Liner® 6" & 10"x 30 km for New Booster Station BS 132 & Enhancements to BS – 131, Kuwait Oil Company.  2012-2013
  • Free standing HDPE pipe 12” and 20” x 50 km, Tatweer Petroleum, Bahrain. 2011-2012
  • Tite Liner® 4”x 800 km for various flowlines, Occidental of Oman.  2007-2015
  • HDPE lining of 40” x 1.7 km for Replacement of NRPS Main Ring Header, PDO, Oman.  2010-2011.
  • HDPE lining &Rotolining of fittings of 2” to 40” x 2500 km for various PDO, Oman projects, Since 1995.
  • HDPE pond lining x 350,000 square meters for various projects since 1998. Oman, Qatar, Bahrain