Oil & Gas Facility Development – EPC Projects
  • EPC ALBA PL6 Projects - Civil Works for Substation, Transformer Rectifiers, Harmonic Filters, 2017-2018, Fuji/ Danway Bahrain
  • EPCC Contract for Services – CDU Revamp During MAFTA 2017, 2017-2018, ORPIC
  • EPC Contract for Amal 1C Plant & HRSG Project, 2015-2018, PDO
  • EPC of Saih Rawl Permanent PDO Accommodation Complex, 2013-2014, PDO
  • EPC of Amin On-Plot Water Injection Development, 2012-2014, PDO
  • EPC of Saih Nihaydha Middle Ghariff Development Project, 2012-2013, PDO
  • EPC of Yibal Second Stage Depletion Compressor Project, 2012-2014, PDO
  • EPC of Saih Rawl Oil Integrity Piping Replacement Project, 2012-2014, PDO
  • EPC of Fahud Control System Upgrade Project, 2008-2009, PDO
  • EPC of Mabrouk Field Development Project, 2007-2008, PDO
  • EPC Nahada-1 Booster Station, 2006-2008, PDO
Construction Projects – Energy Sector
  • MEI Works of Package 1 – EPC Package 2 – Utilities & Offsites of the Duqm Refinery Project, 2019-2021, Petrofac-Samsung JV
  • CMEI Construction Works at B-62 Oxy Depletion Project, 2019, Enerflex/Oxy
  • MEI works Area 1 BAPCO Modernization Program (BMP) – TTS JV, 2019-2021, TTS JV
  • Procurement, Fabrication & Installation of all CMEI construction works at BISAT Production Facility, 2018-2019, Schlumberger
  • CMEI works for Sulphate Reduction Plant (SRP) On West Island (EPC 3), 2018-2020, Technip / ADNOC Offshore
  • LPP – EPC-2 – Polyethilene & Polypropylene Units – E&I Construction Works, 2017-2020, Tecnimont
  • Construction of Yibal Rejuvenation Project, 2017-2021, PDO
  • Tayseer Early Development Project Construction, 2017-2018, Exterran/PDO
  • BP Civil Pack 7&8 General Civil Works Construction, 2017-2020, BP Oman
  • Amal Steam Surface Facilities Phase 1C - On-Plot Construction,2015-2017, PDO
  • Construction and Installation of Well Site Facilities - Khazzan Gas Project, 2015-2018, BP Oman
  • Mauddud Steam Flood Pilot Project, 2012, ProGauge Technologiess / Tatweer Petroleum, Bahrain
  • Rubble Steam Pilot Project, 2011, ProGauge Technologiess / Tatweer Petroleum, Bahrain
  • Amal Steam  Surface Facilities, 2010-2014, PDO
Power, Water and Solar Projects
  • Balance of Plant (BOP) Const. Works Phase 2, 2018, GlassPoint Solar
  • Barka IWP Project – Electrical Erection Works, 2017, Suez International
  • Erection, Installation and testing of Electrical works for Musandam Power Plant, 2017, Wartsila
  • Balance of Plant (BOP) Const. Works Phase 1, 2016-2018, GlassPoint Solar
  • EPC Contract for Amal 1C Plant & HRSG Project, 2015-2018, PDO
  • BP Khazzan Raw water Treatment Project,2015 Veolia
Off- Plot Project
  • EPC of Well Testing Facilities, 2011-2014, PDO
  • EPC of Lekhwair Water Injection Project, 2011-2013, PDO
  • Flowline Installation & Site Construction Services, 2011-2012, BP
  • Saih Rawl Gathering Expansion Project , 2006 , PDO
  • EPC Lekhwair Flow line Construction, 1995-1996, PDO
  • EPC Flow line & Manifold Construction Contracts, 1992-1993, ELF
Gas Treatment and Compression
  • CMEI for Hawqa Extension project, 2019, Exterran/PDO
  • Construction Works for Sadad North EDF Project , 2019-2020, Enerflex/PDO
  • Tayseer Early Development Project,2017-2018, Exterran / PDO
  •  Construction Services for Khulud Gas Development Phase 1, 2017-2018, Enerflex/PDO
  • Construction & Installation Package at Haqwa  Zauliyah(PDO), 2016-2017, Exterran/PDO
  • Daleel Petroleum – 2nd Gas Processing Train, 2016-2017, Exterran/Daleel Petroleum
  • Khamilah Gas Compressor Project, 2015, Enerflex / Occidental
  • Construction for Abu Tabul Gas plant Project, 2012-2014, Enerflex/OOCEP
  • Upgradation of Zuliyah Production Station, 2011, Exterran / PDO
  • Khazzan Gas Compression Facility, 2009-2010, Enerflex / BP
  • EPC of Gas Supply to Downstream Industries, 2008 to 2009, OGC
  • Daleel Gas Processing Plant , 2007-2008, Exterran / Daleel Petroleum
  • Zauliyah Gas Gathering/ Production Plant, 2007-2008, Exterran / PDO
  • Lekhwair GCU & Compression PC Project, 2007-2008, PDO
Long Term Service Contracts
  • Provision of General Construction Services Contract (E&I works) at Mukhaizna Field (53) and 72 Block in Sultanate of Oman, 2019-2024, Occidental
  • Pot Relining Services -2019-2025, Qatalum
  • Anode Stem Repair Workshop, 2019-2024, Qatalum
  • ABF Refractory Maintenance, 2019-2022, Qatalum
  • Pot Relining Services , 2019 - 2023, Ma’aden Aluminium
  • Anode Stem Repair Workshop, 2019-2021, Ma’aden Aluminium
  • Provision of Engineering, Procurement, Construction (EPC) Services. – BP Khazzan, 2018-2023, BP Oman
  • Oil & Gas Integrated Construction & Maintenance Services, 2017-2020, Tatweer Petroleum, Bahrain
  • Pot Re-lining Mechanical works, 2016 - 2019, Ma’aden Aluminium
  • EPCC on Call off Basis Contract, 2016-2021, ORPIC
  • Engineering, Procurement & Construction Contract – Nimr, 2015-2021, PDO
  • Pot Re-lining Services Contract, 2014 - 2019, Qatalum
  • Civil Works Services for Safah (Block 09) and Wadi Lathem (Block 27) Fields, 2013-2020, Occidental
  • Provision of General Construction Services-II, Awali Oil Field, 2012-2016, Tatweer Petroleum, Bahrain
  • Engineering & Maintenance Contract – North Oman, 2011-2021, PDO
  • Provision of General Construction Services-I, Awali Oil Field, 2011-2014, Tatweer Petroleum, Bahrain
  • Mukhaizna Maintenance Service Contract, 2007-2010, Occidental
  • KSF Integrated Service Contract, 2007-2011, Medco
  • Engineering & Maintenance Contract – North Oman, 2005-2010, PDO
  • Wellhead & Field Monitoring Equipment Maintenance & Support , 2001-2011, PDO
Tanks
  • Construction of  5-Chamber Gas Floatation Tank (RETROFIT) and BOP Works at Occidental Mukaizana , 2020, Exterran/PDO
  • EPC of Fire Water tanks (2 Nos)- Yibal Rejuvenation Project, 2019-2020, PDO
  • EPC of Tayseer Field Erected Tanks (5 Nos) , 2017-2018, Exterran/PDO
  • Engineering & construction of enhanced 6-chamber gas floatation Tank Marmul, 2019-2021, PDO
  • EPC of 2 numbers storage tanks (API 650) at Khulud Phase 1, 2018, Enerflex/PDO
  • Construction of Feed Water Storage Tanks (3 Nos) at Amal, 2016-2017, Glass Point
  • EPC of one LIN storage tank (Cryogenic Tank), 2018, Air Liquide
  • Fabrication of 6 chamber GFT at Nimr (PDO), 2017-2018, Exterran/PDO
  • Construction of Tanks (6 Nos) for Amal Steam Surface facilities Project, 2016-2017, PDO
  • EPC Sadad Dehydration Tank Project, 2016-2017, PDO
  • EPC of 8 Tanks for WTP-LOT 4 at  Mukhaizana, 2013-2014, Occidental
  • EPC of 10 Tanks at Safah and Wadi Latham, 2012- 2015, Occidental
  • EPC of 3 Condensate & Diesel storage Tanks at Abu Tabul Block-60 Gas Processing Plant, 2012-2013, Enerflex / OOCEP
  • EPC of 4 Chamber Gas Floatation Tank at Suwaihat, 2012-2013, PDO
  • EPC of 7 Tanks for GAP SAC Project, 2010, Occidental
Turnaround & Shutdown
  • CDU Off-Sites Turnaround 2020 & CBDC Warranty Shutdown at Ruwais Refinery (West) Abu Dhabi, 2020, ADNOC – UAE
  • Turnaround Main Execution works in Block –D2 2020 TAR, 2020, SATORP- Saudi Arabia
  • Term Contract for Shutdown and Routine Maintenance Services, 2019-2024, BAPCO- Bahrain
  • Non-Turnaround Inspection of Due Equipment at Ruwais Refinery West, 2019-2020, ADNOC – UAE
  • Modular Shutdown GUP & BeAAT Units including desalination Units 1,2,3,5 & Waste Heat Recovery Boiler (R4128) at Ruwais Refinery (East) – 2019-2020, ADNOC-UAE
  • Call-off Contract for Turnaround Main Mechanical Works during Turnaround, 2018-2023, ORPIC-Oman
  • Industrial Plant Cleaning Services and Maintenance services, 2018-2025, Oman LNG - Oman
  • Aromatics Package-1 2017 Turnaround, 2017, EQUATE Petrochemical Company-Kuwait
  • EG1 and ASP Turnaround -2016 Equate Kuwait ,2016, EQUATE Petrochemical Company - Kuwait
  • Long Term TA Routine Main Mechanical (Static) Contract, 2015-2018, ORPIC - Oman
  • OMC Turnaround 2015 - Non- Reformer Jobs, 2015, OMC - Oman
  • Main Mech. Contract Static –Mina-Al Fahal Refinery, 2014, ORPIC - Oman
  • Turnaround of  Salalah Methanol Plant, 2014, SMC - Oman
  • Major Refinery Turnaround – Mina-Al Fahal Refinery, 2012 , ORPIC
  • Major Refinery Turnaround – Sohar, 2010 , ORPIC - Oman
  • Major Refinery Turnaround – Mina-Al Fahal Refinery, 2007, ORPIC - Oman
Workshop – Fabrication
  • FEED Effluent Coolers & Exchangers ( 28 Nos) for DUQM Refinery Project, 2019-2020
  • Condensers & Oil Cooler Exchangers ( 4 Nos) for LINDE gasification plant project, 2020
  • Crude Stabilizer Exchanger ( 1 No) for Al Noor Rejuvenation Project , 2019
  • Refrigeration Gas Chiller Exchangers ( 2 Nos) for FPSO Offshore Project( Guanabara MV31), 2019
  • Glycol Dehydration Package ( 1 Module) for BP Khazzan Ph II Project, 2019
  • Compressor (2 Nos) & Economiser Skids ( 1no) for Salalah LPG project, 2019
  • Well Hook Up & Utility skids ( 40 nos) for BP Khazzan Phase II project, 2019
  • HP & LP Separators ( 5 Nos) for GC 32 project, KOC Kuwait, 2019
  • Separator vessels ( DSS Materials – 7 Nos) for CSC project, SONATRACH, Algeria 2019
  • Drain Vessels & Test Separators ( 4 nos) for Lekhwair RMS & Shammar project, 2018
  • Modularised Well Hook Up Skid ( 1 No) for Abu Tubul Block 60, OOCEP project , 2018
  • Stripper Columns ( 4 Nos) for Salalah LPG project , 2018
  • Scrubbers ,Slug Cather & Degasser Vessels ( 18 Nos) for Yibal Rejuvenation Project, 2017
  • Gas Dehydration Modules ( 2 Nos) for RHIP Project 2016-2017
  • Heavy Thick Clad Separators ( 4 Nos) for Mabrouk Deep Ph 3 project, 2015-2017
  • SS Vessels & CS Vessels ( ~60+ Nos) for LPIC Project , 2017-2018
  • Columns & Exchangers ( 11 Nos) for LPIC Project , 2016-2017
  • Cladded , SS vessels & Columns ( 21 Nos) for Yibal Khuff Project , 2016-2017
  • HP/LP Pressure Vessels  CS+ Alloy 825/625 ( 6 Nos) for RHIP , 2015-2016
Workshop Maintenance
  • PSV repair & testing service contract for Occidental Block 62 ,2019 -2024, Occidental
  • Call off contract for isolation valves service & testing, 2019 -2022, ORPIC
  • Various valves (Over 500 Nos) Pre installation pressure testing for Yibal Rejuvenation Project, 2018-2019, PDO
  • Repair & testing of various valves, pumps, RVs and other equipment, Exterran Middle East
  • High & Low energy Centrifugal Pump Maintenance Services, Hydro middle East Inc / PDO.
  • Repair & testing of various valves, pumps, RVs and other equipment’s for PDO
  • Call off contract for isolation valves service & testing, 2016 -2019, ORPIC
  • Repair & testing of various valves, RVs and other equipment for BP Khazzan Project, BP Oman
  • Call off contract for multistage centrifugal pumps overhauling- 2015-2018, ORPIC
  • Relief Valves Calibration & Maintenance for MAF Refinery during Shutdown, 2014, ORPIC
  • Relief Valves Calibration & Maintenance for Salalah Methanol during TA Shutdown, SMC, 2014
  • Ball valves repair & testing service contract ,2014 -2019, Occidental of Oman Inc.
  • Relief Valves Calibration & Maintenance for ORPIC Sohar plant during TA Shutdown, 2013, ORPIC
  • Repair & maintenance of pumps, valves, PSV/PRV/PVVs, 2012- 2016, Shell Oman marketing MAF
  • Service contract for pumps, valves, compressor, blower, mechanical parts repair - 2009-2019, Occidental Mukhaizna
  • High and low energy centrifugal Pump Maintenance Services Contract, 2002-2016, PDO
Aluminium Smelter Fabrication & Maintenance Services
  • Booster Busbar Project, Maaden, KSA, 2020-2021, Ma’aden Aluminium
  • Pot Relining Services -2019-2025, Qatalum
  • Anode Stem Repair Workshop, 2019-2024, Qatalum
  • ABF Refractory Maintenance, 2019-2022, Qatalum
  • Pot Relining Services , 2019 - 2023, Ma’aden Aluminium
  • Anode Stem Repair Workshop, 2019-2021, Ma’aden Aluminium
  • R-48 Shutdown Welding of Tie-in ALBA Potline 4,2019, ALBA
  • Shutdown Tie-in welding of R-48(Negative & Positive) at Aluminium Bahrain(ALBA), 2019-2020, Airmech/ALBA
  • Aluminium welding of DCDS Contact Repair under live conditions, Mar 2019, Emirates Global Aluminium
  • Pot Relining Services,2019-2025, Qatalum
  • Installation and Welding of Rectifiers Bus bar System ALBA PL-6 , Harmonic Filter Welding, 2018-2019, FUJI-DANWAY / ALBA
  • Anode Stem Maintenance Contract by Sohar Aluminum, 2017-2018, Sohar Aluminium
  • Booster Busbar Project : Installation of Busbars for Booster, 2017, Sohar Aluminium
  • Fabrication of Cathode bars , 2017, Sohar Aluminium
  • Emergency Crew for Busbar repair and other services ,2017- 2018, Sohar Aluminium
  • Yanbu Ti-Sponge Project DC and AC Bus Work , Installation and Welding , 2016,CTCI Arabia Limited
  • Pot Re-lining Mechanical works, 2016 - 2019, Ma’aden Aluminium
  • Anode Stem Repair Workshop, 2016-2019, Qatalum
  • Aluminium Busbar Installation, 2016 , CPCA JV (Advanced Metal Industries Cluster Company Ltd( AMIC) and Toho Titanium Co Ltd (TOHO)
  • Pot Re-lining Services Contract, 2014 - 2019, Qatalum
  • Live Tie-in welding of R-50(Negative & Positive) at Aluminium Bahrain(ALBA), 2014, Fuji/Airmech
  • Kitimat Smelter Modernization Project- Anode Beam machining , 2012-2014, United Industrial Services Company LLC (UNISCO)
  • Installation and Welding of Rectifiers Bus bar System for EMAL Phase -II , 2012-2013, Fuji/ Danway
  • Installation and Welding of Rectifiers Bus bar System for EMAL Phase-I & Phase – I Upgrade , 2009-2012, Fuji/ Danway
  • Emirates Aluminium Bus bar Project ( EMAL) , 2009-2010, SNC -Lavlin Worley Parson (SLWP)
  • Anode Stem Maintenance Contract by Sohar Aluminum, 2008- 2013, Sohar Aluminium
  • Sohar Aluminium Busbar Project, 2006 – 2008, Bechtel/Sohar Aluminium
HDPE Tite Lining, Rotolining, Free standing, Pond lining - Engineering, Procurement, Construction & Maintenance Projects
  • Tite Liner® 16’ x 2KM and 24’ X 2.5KM, Manifa High Temperature PE-RT project.DS 26/27 for Saudi Aramco ,2019
  • Tite Liner® 12’’ x 17KM, Harmaliyah Injection Header for Saudi Aramco,2019
  • Tite Liner® 6”x 660 KM for various flowlines at KOC North & South Field, Kuwait Oil Company, 2018-2019.
  • Tite Liner® 3-24’’ x 35KM for various piping, Petroleum Development Oman
  • Tite Liner® 6" x 200 km for GC30 Project, Kuwait Oil Company, 2017
  • Tite Liner® 16” x 2.5 km Manifa, Saudi Aramco, 2017
  • Tite Liner 24” x 6.5 km Safaniya, Saudi Aramco, 2017
  • Tite Liner® 8"x 16.5 km, In Salah Gas, Algeria, 2016
  • Tite Liner® 6" to 36” x 430 km for Wara Pressure Maintenance Project, Kuwait Oil Company, 2014-2015
  • Tite Liner® 4” to 24” x 200 km for various flowlines, headers at Daleel Petroleum, 2014-2015
  • Tite Liner® 3” and 8” RAS Tanura Integrated Project, Saudi Arabia, 2014
  • Tite Liner® 24”x 2.5km (one section) for offshore produced water disposal pipeline, Oxy Qatar, 2013
  • Tite Liner® 4” – 18”x 157 km for Effluent Water Injection Phase–I and Sea Water Injection Phase –II, Kuwait Oil Company, 2012-2014
  • Tite Liner® 6" & 10"x 30 km for New Booster Station BS 132 & Enhancements to BS – 131, Kuwait Oil Company, 2012-2013
  • Free standing HDPE pipe 12” and 20” x 50 km, Tatweer Petroleum, Bahrain, 2011-2012
  • Tite Liner® 4”x 800 km for various flowlines, Occidental of Oman, 2007-2015
  • HDPE lining of 40” x 1.7 km for Replacement of NRPS Main Ring Header, PDO, Oman, 2010-2011
  • HDPE lining & Rotolining of fittings of 2” to 40” x 2500 km for various PDO, Oman projects, Since 1995
  • HDPE pond lining x 350,000 square meters for various projects since 1998. Oman, Qatar, Bahrain