Project Gallery

View our Landmark Projects

Oil & Gas Facility Development – EPC Projects
  • EPC Contract for Amal 1C Plant & HRSG Project, 2015-2018, PDO
  • EPC of Amin On-Plot Water Injection Development, 2012-2014, PDO
  • EPC of SaihRawl Permanent PDO Accommodation Complex, 2013-2014, PDO
  • EPC of SaihNihaydha Middle Ghariff Development Project, 2012-2013, PDO
  • EPC of Yibal Second Stage Depletion Compressor Project, 2012-2014, PDO
  • EPC of SaihRawl Oil Integrity Piping Replacement Project, 2012-2014, PDO
  • EPC of Fahud Control System Upgrade Project, 2008-2009, PDO
  • EPC of Mabrouk Field Development Project, 2007-2008, PDO
  • EPC Nahada-1 Booster Station, 2006-2008, PDO
Oil & Gas Facility Development - Construction Projects
  • Erection, Installation and testing of Electrical works for 120MW Musandam Power Plant, 2016, Wartsila
  • Construction for On-Plot Amal Steam Surface Facilities Phase 1C, 2016-2017, PDO
  • Piping, Fabrication and Erection works for Sohar Refinery Improvement Project, 2016, Petrofac/Daelim
  • Construction and Installation of Well site Facilities - Khazzan Gas Project, 2015-2018, BP Oman
  • Procurement & Construction of Sur Gas Supply Station, 2012-2013, PDO
  • Mauddud Steam Flood Pilot Project, 2012, ProGauge Technologies / Tatweer Petroleum, Bahrain
  • Rubble Steam Pilot Project, 2011, ProGauge Technologies / Tatweer Petroleum, Bahrain
  • Amal Steam Surface Facilities, 2010-2014, PDO
  • Harweel Cluster Phase II, 2008-2009, PDO
  • Burhaan Phase-II Construction Project, 2004-2005, PDO
  • SaihRawl - Phase IV Expansion, 2004-2005, PDO
Off - Plot Projects
  • EPC of Well Testing Facilities, 2012-2014, PDO
  • EPC of Lekhwair Water Injection Project, 2011-2012, PDO
  • Flowline Installation and Site Construction Services, 2011-2012, BP
  • SaihRawl Gathering Expansion Project , 2006 , PDO
  • EPC LekhwairFlowline Construction, 1995-1996, PDO
  • EPC Flow line & Manifold Construction Contracts, 1992-1993, ELF
Gas Treatment and Compression
  • Khamilah Gas Compressor Project , 2015 , Enerflex / Occidental
  • Block-62 Gas Plant Rental Project, 2015-2016 , Enerflex / Occidental
  • Construction for Abu Tabul Gas plant project, 2012-2014, Enerflex/OOCEP
  • Upgradation of Zuliyah Production Station, 2011, Exterran / PDO
  • Khazzan Gas Compression Facility, 2009-2010, Enerflex / BP
  • EPC of Gas Supply to Downstream Industries, 2008 to 2009, OGC
  • Daleel Gas Processing Plant , 2007-2008, Exterran / Daleel Petroleum
  • Zauliyah Gas Gathering/ Production Plant, 2007-2008, Exterran / PDO
  • Lekhwair GCU & Compression PC Project, 2007-2008, PDO
Long Term Service Contracts
  • Engineering, Procurement & Construction Contract – Nimr, 2014-2016, PDO
  • Pot Re-lining Mechanical works, 2016 - 2018 , Ma'aden Aluminium
  • Pot Re-lining Services Contract, 2014 - 2019, Qatalum
  • Civil Works Services for Safah (Block 09) and Wadi Latham (Block 27) Fields, 2013-2016, Occidental
  • Engineering & Maintenance Contract – North Oman, 2011-2017, PDO
  • Provision of General Construction Services, Awali Oil Field, 2011-2014, Tatweer Petroleum, Bahrain
  • Mukhaizna Maintenance Service Contract, 2007-2010, Occidental
  • KSF Integrated Service Contract, 2007-2010, Medco
  • Engineering & Maintenance Contract – North Oman, 2005-2010, PDO
  • Wellhead & Field Monitoring Equipment Maintenance &Support , 2001-2011, PDO
  • Engineering Service Contract DCME&I, 2001-2005, PDO
  • North Oman Campaign Maintenance, 1996-2001, PDO
  • Pipeline Maintenance Contract for North & South Oman, 1996-2000, PDO
Tanks
  • EPC of 8 Tanks for WTP-LOT 4 at Mukhaizana, 2013-2014, Occidental
  • EPC of 10 Tanks at Safah and Wadi Latham, 2012- 2014, Occidental
  • EPC of 3 Condensate & Diesel storage Tanks at Abu Tabul Block-60 Gas Processing
    Plant, 2012-2013, Enerflex / OOCEP
  • EPC of Tanks at Amin On-Plot Water Injection Development, 2012-2014, PDO
  • EPC of 4 Chamber Gas Floatation Tank at Suwaihat, 2012-2013, PDO
  • EPC of 7 Tanks for GAP SAC Project, 2010, Occidental
  • EPC of 5 Tanks at Shah &Sahil Field Abu Dhabi, 2010- 2012, TR / ADCO
  • EPC of 5 Tanks at Marmul Polymer Flooding Project, 2007-2008, BEC/PDO
  • EPC of 3 Tanks at Safah and Wadi Latham, 2007- 2008, Occidental
Turnaround & Shutdown
  • Long Term Incentivized Routine Main Mechanical (Static) TA Contract, 2015-2018, ORPIC
  • ORPIC 2015 Sohar refinery Emergency shutdown, 2015 , ORPIC
  • OMC Turnaround 2015 - Non Reformer Jobs, 2015, Oman Methanol Company LLC
  • Main Mechanical (Static) –Mina-Al Fahal Refinery, 2014, ORPIC
  • Turnaround of Salalah Methanol Plant, 2014, SMC
  • Turnaround of Aromatics Plant – Sohar Refinery 2013 , ORPIC
  • Turnaround of Polypropylene Plant – Sohar 2013, ORPIC
  • Major Refinery Turnaround – Mina-Al Fahal Refinery, 2012 , ORPIC
  • Minor Refinery Shutdown – Mina-Al Fahal Refinery, 2010 , ORPIC
  • Major Refinery Turnaround – Sohar, 2010 , ORPIC
  • Minor Refinery Shutdown – Mina-Al Fahal Refinery, 2008 , ORPIC
  • Major Refinery Turnaround – Mina-Al Fahal Refinery, 2007 , ORPIC
Workshop – Fabrication
  • Fabrication & supply of HP CS vessels with U2 stamp for Rabab Harweel Integrated Project(RHIP), 2015-2016, Petrofac/PDO
  • Fabrication & Supply of CS/SS , Pressure Vessels for BP Khazzan CPF, 2015-2016, Petrofac / BP
  • Fabrication & supply of Process & Utility Skids for BP Khazzan CPF, 2015-2018, Petrofac/BP
  • Supply of Cyclic Steam Service Manifolds (13 nos) for Amal 1C project, 2015-2016, Worley Parsons/PDO
  • Fabrication of Power Modules for HRSG (12 Nos) for Amal-1C Steam Project, 2014-2015, Nooter/ Eriksen/ PDO
  • Columns & Vessels for Sohar Refinery Improvement Project, 2014-2015 Daelim-Petrofac / ORPIC
  • Flow Splitters & Surge Vessels for Amal-1C Project , 2014-2015, WorleyParsons/PDO
  • Cyclic Steam Service Manifolds for Amal Stem Project, 2014, Al Turki/PDO
  • Fabrication of 59 MSV Skids for South ODC, 2014-2015 Al Turki/ PDO
  • Fabrication of Power Modules for HRSG (10 Nos) for Amal-1B Steam Project, 2012, Nooter Eriksen/ PDO
  • Fabrication of SS & CRA piping for Turkmenistan Gas Project, 2011-2012, Petrofac
  • Fabrication of OTSG Steam Generators (7 Nos) for Amal Steam Project, 2010 - 2011, Progauge Technologies
  • ASME Boiler Piping Fabrication - QarnAlam Steam Project , 2009-2010, Dodsal/PDO
  • HP Steam Separators for QarnAlam Steam Project , 2009-2010, Dodsal/PDO
  • HP Test Separator package –Khazzan Gas Compression Facility,2009-2010, Enerflex/BP
Workshop Maintenance
  • Relief Valves Calibration & Maintenance for MAF Refinery during Shutdown, 2014, ORPIC
  • Relief Valves Calibration & Maintenance for Salalah Methanol during TA Shutdown, SMC, 2014
  • Centrifugal Pumps Maintenance for Occidental Mukhaizna, 2013-2014, Occidental
  • Relief Valves Calibration & Maintenance for Sohar Refinery during Shutdown, 2013, ORPIC
  • High Energy Centrifugal Pump Maintenance Services Contract, 2011-2015, PDO
  • Routine Pump Maintenance Services Contract, 2010-2014, PDO
  • Centrifugal Pump Repair/ Service Contract , 2005-2010, PDO
  • Centrifugal Pump Maintenance Services Contract, 2002-2010, PDO
Aluminium Smelter Fabrication & Maintenance Services
  • Pot Re-lining Mechanical works, 2016 - 2018 , Ma'aden Aluminium
  • Aluminium Busbar Installation, 2016 , CPCA JV (Advanced Metal Industries Cluster Company Ltd( AMIC) and Toho Titanium Co Ltd (TOHO)
  • Pot Shell maintenance contract , 2014 - 2020 , Qatalum(Qatar Aluminium)
  • Live Tie-in welding of R-50(Negative & Positive) at Aluminium Bahrain(ALBA), 2014, Fuji/Airmech
  • Kitimat Smelter Modernization Project- Anode Beam machining , 2012-2014, United Industrial Services Company LLC (UNISCO)
  • Installation and Welding of Rectifiers Bus bar System for EMAL Phase -II , 2012-2013, Fuji/ Danway
  • Installation and Live Welding of Rectifiers Bus bar System for EMAL Phase – I Upgrade , 2011-2012, Fuji/ Danway
  • Installation and Welding of Rectifiers Bus bar System for EMAL Phase-I, 2009-2010, Fuji/ Danway
  • Emirates Aluminium Bus bar Project ( EMAL) , 2009-2010, SNC -Lavlin Worley Parson (SLWP)
  • Short Circuit Bridge for Sohar Aluminum , 2008, Sohar Aluminium
  • Anode Stem Maintenance Contract by Sohar Aluminum, 2008- 2013, Sohar Aluminium
  • Sohar Aluminium Busbar Project, 2006 – 2008, Bechtel
HDPE Tite Lining, Rotolining, Free standing, Pond lining - Engineering, Procurement, Construction & Maintenance Projects
  • HDPE free standing HDPE piping system 12”, 20” x 50 km, 2011to 2012, Tatweer Petroleum, Bahrain
  • HDPE Tite fit Lining of 24”x 2.5km for Offshore produced water disposal pipeline, Halul Island, Oxy Qatar
  • HDPE Tite fit Lining of 8"x 16.5 km, 2014-2015, In Salah Gas, Algeria
  • HDPE Tite fit Lining of 6" to 36” x 430 km for Wara Pressure Maintenance Project, 2014-2015, Kuwait Oil Company
  • HDPE Tite fit lining of 4” - 18”x 157 km for Effluent Water Injection Phase-I and Sea Water Injection Phase -II, 2012 to 2014, Kuwait Oil Company
  • HDPE Tite fit lining  of 6" & 10"x 30 km for New Booster Station BS 132 & Enhancements to BS - 131, North, 2012 -2014, Kuwait Oil Company
  • HDPE Tite fit lining & Rotolining of fittings 3”, 8” x RAS Tanura Integrated Project, 2014, , Kingdom Of Saudi Arabia
  • Service Contract for HDPE Tite fit lining  of 4” to 24” x 200 km for various flowlines, headers at Daleel field, 2014-2015 with Daleel Petroleum LLC
  • Service contract for HDPE Tite fit lining of 4”x  800 km for various flowlines,  2007-2015 (ongoing), Occidental Of Oman
  • HDPE lining of 40” x 1.7 km for Replacement of NRPS Main Ring Header , 2010 to 2011, PDO, Oman
  • HDPE lining & Rotolining of fittings of 2” to 40” x 2500 km for various PDO projects, Since 1995 (ongoing), PDO, Oman
  • HDPE pond lining x 350,000 sq meter for various projects , Since 1998 (ongoing), Oman, Qatar, Bahrain